Laserfiche WebLink
<br /> <br />PROJEC T IDENTIFICATION <br />Task # : 001 <br />Date : 03/22/2001 <br />User : LDO <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Otero <br />Site :North River Pit <br />Permit/job# : M-1999-005 <br />Abbreviation :none <br />Filename : M005-001 <br />Agency or organization name : DMG <br />Permit or other job action :Bond Increase due to TR-1 <br />task description :Spread staging area pad materials on lake bank slope <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown • Ownership cosUhour : $43.30 NA <br />OperatingcosUhour : $66.26 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $137.56 Tota l fleet cosUhour : $137.56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 13,900 CCY factor : 1.125 volume : 15,638 LCY <br />Source of estimated volume : TR-f and Inspection Report <br />Source of estimated swell factor :cat hndbk <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 750 feet Material consistency : 0.90 (Cat HB <br />Unadjusted hourly production : 685.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg,) <br />Material consistency description : Job efficiency : 0.83 (15hifVda <br />Compacted fill or embankment Spoil pile : 0.70 ((nd-mfg <br /> Push gradient : 1.02 (Cat HB <br />Average push gradient : 1.00 % (neg) Altitude : 1.00 (Cat HB <br />Average site altitude : 4,035 feet Material weight : 0.90 (Cat HB <br /> Blade type : 1.00 (S/SU/L, <br />Material weight : 2,550 Ibs/LCY Net correction : 0.36 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 247.98 LCYihr <br /> Adjusted fleet production : 247.98 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 63.06 Hours <br />Unit cost : $0.555 /LCY Total job cost : $8,674 <br />