My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23837
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:55 PM
Creation date
11/21/2007 10:32:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Enforcement
Doc Date
7/18/1990
Doc Name
RESPONSE TO FINAL DESIGN ANALYSIS FOR HR-6 SNYDER QUARRY CAP WHICH WAS PRESENTED ON BEHALF OF CAST
From
GORSUCH KIRGIS CAMPBELL WALKER AND GROVER
To
MLRB
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii iiiiiiiiiiiuiii <br />G ORSUC H, KIRGIS, CAMPBELL, WALKS RAND GROVER <br />ATTORNEYS AT LAW <br />101 N. CASCADE AVE. <br />S U1TE 310 <br />THOM46 M. JAMES COLORADO SPRINGS <br />COLORADO <br />, <br />LAVER OFFICE <br />TqM MY W. AVERS <br />80903-1622 I ~ p <br />ANNE T. REL50N ~ ~ ~ ~ ~ ~ ~ I9 I SEVENTEENTH ST, <br /> <br />TELEPHONE 0191 633-6061 R~ - ITS 1100 <br /> p. O. BO>< I~180 <br />DENVER LINE 13031620-9020 DENVER, CO 8021 <br />TELECO PIERf9191636-6961 ~ R ~'~~ <br />JUL TELEPHONE <br /> (303) 539-1200 <br />Jul 13 1990 MINED LANiJ <br />Y I Tf LECO PIER <br />1 <br /> <br />::G'."~_AMpTlnf~i 11t1Ar 303) 298-0215 <br />„~' <br />Daniel Hernandez <br />Mined Land Reclamation Board <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Re: Response to Final Design Analysis for HR-6 Snyder Quarry <br />CAP which was presented on behalf of Castle 1~oncrete <br />Company. <br />Dear Dan: <br />Enclosed please find the report prepared on behalf of the <br />Cedar Heights Lenders by Kiowa Engineering Corporation in :response <br />to the Final Design Analysis for HR-6 Snyder Quarry CAP and various <br />responses to that report received from the Mined Land Rec.amation <br />Board and other interested parties in this case. In summ:;ry, the <br />Cedar Heights Lenders request that Option No. 6 be approve3 by the / <br />Mined Land Reclamation Board for resolving the drainage :Lssue at <br />the HR-6 location. The other options serve to divert flow out of <br />the HR-6 basin into another sub-basin, which is, in the esr_imation <br />of our engineer, an unacceptable solution to this problem, <br />After you've had an opportunity to review the report, please <br />feel free to call me if you have any questions. I have forwarded <br />a copy of this report to Scott Briggs, attorney for Castle <br />Concrete, and will be in contact with him prior to the he~iring to <br />see if we can reach an agreement regarding the HR-6 culvert. <br />Very truly yours, <br />Gorsuch, Kirgis, Campbell, <br />Wa ker and Grover <br />Tammy W. Ake <br />TWA:ss <br />Enclosure <br />cc: Jean Hyde <br />Yolvondra Martin, Esq. <br />Brenda Bartels, Esq. <br />
The URL can be used to link to this page
Your browser does not support the video tag.