My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12297
DRMS
>
Back File Migration
>
Revision
>
REV12297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:16 AM
Creation date
11/21/2007 10:31:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
Revision
Doc Date
8/18/1995
Doc Name
DOMTAR GYPSUM QUARRY TEMPORARY CESSATION STATUS PN M-77-247
From
DMG
To
AZURITE INC
Type & Sequence
HR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~i~ -ii~ii~tiii-ii ~i~ <br />STATE <br /> <br />OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman Sl., Room 215 <br />Denver, Colorado 8D203 <br />Phone: 1303) Bbb-3567 <br />FAX.(3031832-8106 <br />August 18, 1995 <br />Mr. Kenneth S. Klco <br />Azurite, Inc. <br />10001 CR 12 <br />P.O. Box 338 <br />Cotopaxi, CO 81223 <br />RE: Domtar Gypsum Quarry - Temporary Cessation Status <br />Permit No. M-77-247 <br />Dear Mr. Klco: <br />~~~~~~ <br />DEPARTMENT OF <br />NATURAL, <br />RESOURCES <br />ROy Romer <br />Governor <br />lames S. Lochhead <br />Executive Duecwr <br />Michael B Long <br />Division Dueuor <br />We have received your request on behalf of Domtar to continue the <br />period of temporary cessation for the Domtar Gypsum Quarry for an <br />additional five (5) years. However, we do require approval of the <br />Mine Land Reclamation Board in order to grant this extention. <br />Therefore, we will tentatively schedule your request for the <br />September 27-28, 1995 Board Meeting in Denver. I recommend your <br />participation at this meeting and have attached a list of questions <br />that we anticipate will be asked of us by the Board Members. Your <br />cooperation in helping to answer these questions will be greatly <br />appreciated. Of primary concern is the estimation of an adequate <br />reclamation cost. Also, it is imperative that all planned <br />stormwater controls be constructed and functioning as designed by <br />the September Board Meeting. <br />To this end, I anticipate a 2-3 day field <br />monday, August 28, 1995. Please let me <br />during the week of the 28th to assist me <br />reclamation responsibilities. <br />Sincerely, <br />Thomas A. Schreine~'Xl:r"'~""7 <br />Environmental Protection Specialist <br />cc: Jim Stevens, DMG <br />inspection beginning on <br />know your availability <br />in evaluating remaining <br />M:\oss\Klco <br />
The URL can be used to link to this page
Your browser does not support the video tag.