Laserfiche WebLink
C~ <br />1 <br />3.4 Pre-Sampling Activities and Reports <br />Pre-sampling activities (Task I) could include: preparing for sampling at th site by taking <br />' a 16-40 hour Mine, Safety and Health Act course on cyanide safety, and rea " g of relevant <br />background materials about the facility, including the permits and proceed' s from public <br />and Board hearings. <br />' Written reports will be made to the Contract Administrator at the Mined Lan Reclamation <br />Division. The initial report (Task 2) will address the sampling and analytical protocol <br />' document, and could be completed before the first scheduled sampling. mments on all <br />aspects of the sampling and analytical methodology could be addressed, including the <br />number of parameters (i.e., inclusion of additional metals) to be dete fined in the <br />' monitoring program, analytical methods for free cyanide, decontamination ocedures, etc. <br />Subsequent reports (Task 3; Note: Task 3 also includes the sampling i elf) would be <br />' signiScantly shorter, and would include the analytical resulu reported fr m the chosen <br />laboratory, with comments on unusual or unexpected results, and further re mmendations <br />' for sampling changes, if dictated by the analytical results. i <br />' 3.5 Personnel ' <br />This proposal is submitted assuming that Ann Maest would be the only thin -party sampler <br />' participating from RCG/Hagler, Bailly, Inc. Time is budgeted for administr five/secretarial <br />assistance with reports and administrative duties from personnel at RCG/I-Ia er, Bailly, Inc. <br />' 3.6 Work and Equipment not Included in Budget <br />The project description requires that the third-party sampler would report as duected by the <br />Division to the Contract Administrator and to the Mined Land Recla anon Board. <br />Reporting may also include expert testimony. As it is not known at this t e how much <br />* effort the reporting will involve, no specific hours have been included for thi in the budget. <br />e It is understood that any reporting to the Division or the Boazd would be bill don an hourly <br />basis (see Budget). If expert testimony is required, time for this may be b' ed at a slightly <br />' higher hourly rate. Special Seld equipment requved for site visits, for exa~tple steel-toed <br />boots, are not included in the Budget. <br />1 <br /> <br />' RCG/Hagier, L3ailty, Inc. <br /> <br />