Laserfiche WebLink
acres of disturbance, and only 4-5 acres were disturbed. A civil penalty is necessary because the <br />pond emergency spillway was not installed, therefore, [he sediment pond construction was not <br />complete as required prior to stripping topsoil in the azea draining into the pond. <br />Fault <br />I concur with the Assessment Officer that the level of fault was that of negligence and that <br />5500.00 is appropriate. All parties aereed that the violation was not willful and simply an <br />oversight. <br />Number of Davs Penalty Assessed <br />I concur with 1 day. <br />Good Faith. <br />I concur with the Assessment Officer. <br />Settlement Agreement Penalri <br />History $50.00 <br />.Seriousness $250.00 <br />Fault $500.00 <br />Number of Days Penalty Assessed l <br />Good Faith $0.00 <br />Total Penalty for NOV CV-2000-007 $800.00 <br />