My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23774
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:53 PM
Creation date
11/21/2007 10:31:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Enforcement
Doc Date
6/8/1995
Doc Name
Letter and Settlement Agreement
From
DMG
To
PITTSBURG & MIDWAY COAL MINING CO
Violation No.
CV1995009
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />} <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Sl., Room 215 <br />Denver, Colorado 80203 <br />Phone: 13031 8663557 <br />FAX:13031832-8106 <br />SETTLEMENT AGREEMENT <br />Cessation Order No. <br />Ili <br />DEPARTMENT OF <br />NATURAL <br />RESOURCE <br />Roy Romer <br />Governor <br />lames 5 Lochhead <br />Notice of Violation No. C-95-009 Evecmrve olrecmr <br />Mac hael R. tong <br />Mine:Edna Strip Mine Permit No. C-80-001 n ~,.~D„e,,,,, <br />Permittee: Pittsburg & Midway Coal Mining_CO. <br />Mailing Address: P O Box 6518 Englewood CO 80155-6518 <br />Operator: (If other than Permittee): <br />Mailing Address: <br />County: <br />Type of Mine: SurfaceJFederal <br />The Division of Minerals and Geology ("The Division") issued a certain <br />Notice of Proposed Amount of Civil Penalty, and the operator requested <br />a conference thereon, as authorized by C.R.S. 1973, 34-33-123(8). <br />The requested conference having been held as required by law, on June <br />5. 1995 the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be $550.00 <br />2. The penalty shall be paid to the Division by the operator not <br />later than 30 days from the date this agreement is signed by <br />all parties; <br />3. Payment of such penalty by the operator shall constitute a <br />waiver of all further rights to review of such penalty or of <br />the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator <br />within ten days after the closing date of such conference, which date <br />is set forth below opposite the signature of the Conference Officer. <br />If not so signed, the Division will fix the penalty at whatever amount <br />it deems appropriate, based upon the factors referred to in C.R.S. <br />1973, 34-33-123(8)(d). <br />OPERATOR: <br />DATE: <br />DATE: G~~.zl~~ <br />Penalty Adjustment Reviewed <br />IRUIe 5.04.31411c11 <br />C.R.S. 34-33-12318) Ic11A1 <br />By: <br />DIVISION OF MINFRATS AND GEOLOGY: <br />By ~ <br />ference Officer <br />By <br />Divi io Dire t r <br />
The URL can be used to link to this page
Your browser does not support the video tag.