Laserfiche WebLink
�'- EXHIBIT A <br /> STATE OF COLO_RADO_ <br /> MINED LAND RECLAMATION DIVISION <br /> OF'�O[O <br /> Department of Natural Resources <br /> N< <br /> 1313 Sherman St..Room 215 ��$ <br /> Denver.CO 80203 <br /> 303 866-3567 <br /> FAX: 303 832-8106 ra le <br /> Roy Romer. <br /> Goverrp <br /> Fred R.Banta. <br /> NOV NoC-13. OZ3 NOTICE OF VIOLATION Division Director <br /> Permit No.: L.'40-OD1 Mine: 6G( t,,j L�nx r c_ <br /> Type of Mine: �wfMx /CedA• V County: 90-t4#- <br /> Operator (If Other than Permi ttee ): Permittee: Ld // <br /> S"tf Mail Address: Y.D .Box l /6 <br /> Mail Address: 14UFe.k L'O 90467 <br /> ia4llt Date/Time of Inspection: /o.•ana-w <br /> Inspector: Uirp 4 - 2-113 <br /> Person Served: Served By: <br /> (Signature of person served) (Signature of authorized representative <br /> of Mined Land Reclamation Division) <br /> (Please print name and title) <br /> Date and Time of Service: A.M. <br /> CERTIFIED MAIL NO. P lac) Iba KZ 4 - S- cl3 Z Ob -'15N <br /> Return Receipt Reques <br /> The Mined Land Reclamation Division ("the Division") has conducted an <br /> inspection of the above mine and has made the findings stated in the attached <br /> schedule and has found violations of the Colorado Surface Coal Mining <br /> Reclamation Act, or violations of required permit conditions, listed in the <br /> attached schedule. This notice constitutes a separate notice of violation for <br /> each violation listed. <br /> You must abate each of these violations within the designated abatement time. <br /> Where the remedial action requires submission of plans, the plans are to be <br /> submitted to the Division within the designated time. You are responsible for <br /> doing all work in a safe manner in compliance with all applicable laws and <br /> regulations. <br /> The undersigned finds that cessation of mining is is not _h_ expressly, <br /> or in practical effect, required by this notice. For—this purpose, "mining" <br /> means extracting coal from the earth or from a waste pile and transporting it <br /> within or from the mine site. <br /> C.R. S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br /> $5,000 for each violation and provides that each day of continuing violation <br /> may be deemed a separate violation . <br /> Important: Please read the reverse side of this page. <br /> WHITE - File YELLOW - Operator PINK - Specialist <br />