My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12220
DRMS
>
Back File Migration
>
Revision
>
REV12220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:12 AM
Creation date
11/21/2007 10:30:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977559
IBM Index Class Name
Revision
Doc Date
2/3/1987
Doc Name
FN M-77-559 VALCO INCS CANON CITY EAST PIT AMENDMENT FREMONT CTY ADEQUACY ITEMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Valco, Inc .'s "Canon City East Pit" <br />Adequacy Items Con't <br />February 3, 1987 <br />Page 3 <br />;~i~~ 3. Will you follow the S.f,.S. mulching recommendation (2 tons/acre, <br />crimped)? <br />~ 4. Pursuant to Exhibit D, Number 1.6. above, approximately ten (10) inches <br />~~/ of topsoil should be replaced on the areas requiring vegetation. <br />Ten (10) inches of topsoil would provide more nutrient exchange sites, <br />as well as water holding capacity than four (4) inches incorporated (six <br />(6) inches) into the subsoil (overburden). Please commit to such. <br />5 A. Irregular shorelines, peninsula formation, and islands are encouraged to <br />~)~ improve fishery and wildlife habitat. Please discuss the possibility. <br />B. Minimizing lake surface area is encouraged to minimize water lost <br />through evaporation. Please discuss the possibility of accomplishing <br />such. ~~/~~ti~.c, <br />Exhibit G - Water Information <br />1. From what does the waste water ditch result? /2~/~z~ ~„~ _ c.~.~u',C ~~ z,, <br />2. A copy of the application was transmitted to the State Engineers Office, ~~ <br />Division of Water Resources, for their review and comment, if any. <br />Exhibit L - Reclamation Costs <br />1. Please provide the volumes and costs of <br />A. Backfilling overburden to achieve slopes; and, 0 /~. <br />8. topsoil replacement (10 inches). v ~ , <br />2. Please review the costs of reclaiming the original acreage including <br />dismantling the plant and adjust the current financial warranty <br />accordingly. Please submit your computations for our review. <br />OTHER <br />Please be reminded {hat your Annual Report, hlap and fee are due <br />February 22, 1987. <br />If you have any questions, please do not hesitate to contact me. <br />/b do <br />7257E <br />
The URL can be used to link to this page
Your browser does not support the video tag.