My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23688
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:51 PM
Creation date
11/21/2007 10:29:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
1/8/2002
Doc Name
NOV CV-2001-013 YOAST MINE PERMIT NUMBER C-1994-082
From
SENECA COAL CO
To
DMG
Violation No.
CV2001013
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or cam <br />~` .,sue;8 <br />;~~ ; COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~'B" ~ 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CV-2001-013 <br />MINE: Yoast Mine <br />PERM [T NO.: C-1994-082 <br />OPERATOR/PERMITTEE: <br />-RECEFVED-- <br />JAN 0 8 2002 <br />Dittisian of Minerals and Geelagy <br />DATE ISSUED: October 26, 2001 <br />TYPE OF MINE: Surface/Federal <br />COUNTY: Routt <br />Seneca Coal Company <br />ATTENTION: Robert J. Shevling <br />ADDRESS: 36600 Routt County Road 27 P.O. Box 670 <br />Hayden, CO 81639 <br />The Division of Minerals and Geology ("the Division") issued a certain Notice o£ Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on December 10, 2001, the Division and the operator <br />hereby agree as follows: <br />I. The amount of the penalty shall be $2,300.00; <br />2. .The penalty shall be paid to the Division by the operator no[ later than 30 days from <br />the date this Agreement is signed by all parries; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of [he Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: C.~Y~r[G„~ ~ A 1 <br />By ~ <br />DNISION OF MINERALS AND GEOLOGY: <br />By n >~ `I <br />nference Officer <br />By <br />Division Director <br />DATE: I~ O l I U Z <br />~~ <br />DATE: / Z - ~ z - o <br />Penalty Adjusunem Reviewed <br />[Rule 5.04.3(4)(c)I <br />CRS 34-33-123(tS)(c) and (d) <br />C NVl11 CIWMIII. MPB 'llil l$IU I)IIO PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.