Laserfiche WebLink
~~ : • <br />i ' <br />-3- <br />CI <br />4. Effect on Permit. In addition, if it is determined that a pattern of <br />violations exists ana that the violations were caused by unwarranted failure to <br />comply, or were willful, your permit may be suspended or revoked. <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No. NOV 83-20 <br />NATURE OF VIOLATION: ' <br />Failure to follow the approved mine plan. Specifically, discharging affected <br />water at an unapproved discharge point. <br /> <br />ACT, REGULATION, OR PERIdIT PROVISION(S) VIOLATED: <br />ACT SECTION(S) 34-33-123(2), 34-33-120(2)(j)(II <br />REGULATIOI SECTION(S) 4.05.2(1), 4.05.2(7) <br />PERMIT SECTION(S) <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />lJater contained in the mining pit below Pond C was being pumped into Mann <br />Draw immediately north of the oit. <br />STEPS NECESSARY TU ABATE VIOLATION (REh1EDIAL ACTION): <br />1. Devise and submit a plan for modification and upgrading of the sediment <br />ponds to ensure that they will be able to meet all drainage control <br />requirements at the mine site. This plan should include sealing and <br />lining of Ponds B and C, enlarging Ponds A,B, or C, if necessary, and <br />anv other proposed activities. A time schedule for conducting the pro- <br />posed activities should also be submitted. <br />2. Submit a plan for handling of pit water that will either allow total <br />con ainmen or an appropria a se ing perio an isc arge roug an <br />approved discharge point. <br />