Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV-2000-007 <br />NATURE OF VIOLATION: <br />Failure to complete construction of sediment pond 016 prior to disturbance of the undisturbed area to drain <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT <br />SECTION(S) 120(2)(j)(II)(B) <br />REGULATION <br />SECTION(S) 4.05.6(1)(a) <br />PERMIT <br />SECTION(S) Attachment l3-SB <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />Northern hillside of drainage basin 016 where topsoil was salvaged. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Complete construction of pond 016 and certif~v a qualified registered eneineer that it was constructed <br />as desiened and as approved in the permit. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE October 31 , 2000 <br />NOV FORM (3/95) <br />WHITE -File YELLOW -Operator PINK -Specialist <br />