My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12076
DRMS
>
Back File Migration
>
Revision
>
REV12076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:03 AM
Creation date
11/21/2007 10:28:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Revision
Doc Date
9/11/1979
Doc Name
ROCKCASTLE CO GRASSY CREEK COAL MINE 1 78-45
From
RAYE & ASSOCIATES
To
MLRD
Type & Sequence
HR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />• <br />Mr. Hamlett J. Barry <br />September 7, 1979 <br />Page Two <br />Preparation of stockpile areas immediately before each of these cuts and <br />reclamation immediately following each will take place. <br />Water Truck Loading Area <br />The source of water for dust control is a well permitted by the Colorado <br />Engineer's office. For storage capacity, the Rockcastle Company pumps <br />from the well into an existing stockpond and loads the water truck from <br />the stockpond. The stockpond is located in the valley above the old <br />office area and the Rockcastle Company has been loading its water truck <br />byepulling to the side of the haul road and using a siphon action to load <br />the truck from the pond. For safety, the Rockcastle Company would like <br />to convert the old office area into a roadside pull-off so the water truck <br />could get off the haul road to load. No additional disturbance area is <br />involved, but reclamation of this area will not take place until the end <br />of the mine life. At the end of the mine life, this area will be regraded <br />to approximate original contour, topsoil spread over it to a depth of 12" <br />• or more, and reseeded with the permitting seeding mixture. The pull-off <br />would be gravelled and packed. Since a ditch alongside the haul road col- <br />lects runoff from this area, and since there are adequate sediment control <br />devices in the ditch, no additional sediment control is planned. <br />If I can answer any questions regarding this technical revision request, <br />please feel free to call. <br />Very truly yours, <br />~~ r~~ <br />~/om <br />Tommy Ray <br />mcr <br />cc: Mr. Don Mallory <br />Mr. Bill Zabel <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.