Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 06/21/2006 <br />User : BMK <br />State :Colorado PermiUjob# : M-2004009 <br />County :Weld Abbreviation :none <br />Site :Turnpike Mining Filename :M009-001 <br />Agency or organization name :DMG <br />Permit or other job action :AMENDMENT <br />Task description :CUT SLOPES FROM .5 :1 TO 3:1 <br />;: <br />.. <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes 11 - SU Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $54.16 NA <br />OperatingcosUhour : $75.57 100 <br />Ripper op. cost/hour : $1.99 25 <br />Operator cost/hour : $32.53 NA <br />Total unit cosUhour : $164.26 Total fleet cosUhour : $328.52 <br /> <br />MATERIAL QUANTITIES ,. <br />Initial Swell Loose <br />volume: 420,000 CCY factor: 1.125 volume: 472,500 LCY <br /> <br />Source of estimated volume :EXNI8IT E <br />Source of estimated swell factor :EXHIBIT E <br /> <br />HOURLY PRODUCTION <br />Jab Condition Correction Factors ,. <br />Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 400.0 LCYlhr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 1.00 % (i <br />Average site altitude : 4,930 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Orv packed <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.828 /LCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.02 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.50 <br />HB) <br />HB) <br />Adjusted unit production : 198.39 LCY/hr <br />Adjusted fleet production : 396.77 LCY/hr <br />Total job time : 1190.88 Hours <br />Total job cost : $391,219 <br />