Laserfiche WebLink
<br />-2- <br />2. Duration of Damage <br />The Division believes that some topsoil has been permanently damaged by <br />contact with the spoil material. The Division therefore assesses a <br />duration of long-term and a value of 4. <br />3. Extent of Damage <br />The Division determined that damage had occurred at the time of the <br />inspection. Given the acreage of contaminated topsoil area the Division <br />assesses an extent of slight. The value for slight extent is 1. <br />4x4x1=16 ,yD.,, <br />16 c 64 x $1,150.00 = $437.50 <br />III. Fault <br />The Division feels that the violation occurred as a result of lack of <br />reasonable care on the part of the operator to effectively control erosion and <br />water pollution. In view of this, the Division assesses the minimum value of <br />$250.00 as the civil penalty for fault. <br />Fault Total $250.00 <br />Summar <br />History <br />Seriousness <br />Fault <br />Total <br />Rounded to <br />/ep <br />Doc. No. 2456 <br />- $ 437.50 ~ <br />- $ -c150>00 5 <br />- $ 687.50 N <br />- $ 685.00 ~ l ~ <br />s~ 1~~ <br />~ 5 U <br />