My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23515
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:46 PM
Creation date
11/21/2007 10:27:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Enforcement
Doc Date
10/9/1985
Doc Name
Letter on Abatement Steps
From
PEABODY COAL CO
To
MLRD
Violation No.
CV1985081
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P_y <br />PEABODY C01L COMPANY <br />Roeky Mountain Dhlslon <br />October 7, 1985 <br />Ms. Anne Baldrige <br />Geologist/Hydrologist <br />Mined Land Reclamation Division (MLRD) <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Dear Anne: <br />RE: SENECA II MINE - NOV NO. C-85-081 <br />10375 East Harvard Avenue <br />su~ie aoo <br />Denver. Colorado B023t <br />(303) 337-5903 <br />In reference to the above NOV, a number of abatement procedures <br />have been prescribed. The first step necessary to abate this viola- <br />tion is "to establish and implement a method for periodic monitoring <br />of sediment levels". The deadline for implementation of this first <br />step is October 10, 1985. <br />At the present time a sediment pond survey is being conducted <br />on Ponds 003 (shop area pond) and 004 (southern mining area) to <br />determine present sediment levels in these two ponds. Pond 002 <br />(Wadge impoundment), with its 300 acre-feet capacity, is currently <br />bein evaluated to determine if storage volume is adequate to <br />st°` the 10-year 24-hour storm event as well as necessary <br />sediment storage. Based on the information for Pond 002, and <br />in consultation with MLRD, a determination will be made as to <br />whether the 002 pond will have to be surveyed for sediment volume. <br />The pond surveys will be completed by October 10, 1985. The sediment <br />volume calculations will be submitted as soon as possible thereafter. <br />The information from the surveys and the sediment volume calculations <br />will provide the basis for addressing abatement steps 2, 3 and 4 by <br />the November 15, 1985 deadline. The sampling methodologies <br />(which will provide the basis for the ongoing periodic monitoring) <br />will be detailed in the submittal containing the sediment volume <br />calculations. Additionally, the sediment volume calculations will <br />be compared to the age of the sediment ponds to determine the <br />rate of sedimentation. This will allow for development of realistic <br />sediment pond clean-out schedules. <br />REt:E1~V~~ <br />OCT• 919b~ <br />Y~~ III IIIIIIIIIIIII III <br />F~ ~. <br />MINED IANp <br />RECLAMATION DIVISION <br />
The URL can be used to link to this page
Your browser does not support the video tag.