Laserfiche WebLink
<br />.--~ <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources REC E I V E® <br />Department of Natural Resowces <br />1313 Sherman Street, Room 818 OCT 3 0 2002 <br />Denver, Colorado 80203 j <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.watersta[e.co.us Division ~f Minerals and Geology <br />Response to Reclamation Permit Application Consideration <br />DATE: October 30, 2002 ~ ~ G// <br />iC4' ~F //C~~pt~~Oq . <br />e ~'6 90 <br />N <br />~`~~'o <br />Bill Owens <br />Governor <br />Greg E Watcher <br />Executive DirecYOr <br />Hal D. Simpson, P.E. <br />State Engineer <br />TO: Harry H. Posey, Acting Senior Environmental Protection Specialist ~-,_ _ _ p~~ <br />CC: Division 2 Office; District 11 Water Commissioner _ `~" _ <br />FROM: Don West, P.E. 'J / <br />RE: Number 6 Pit, File No. M-1978-192 CN-1 <br />Operator: Chaffee County, . <br />Contact: Joe Nelson 719/539-4591 <br />Section 3Q Twp 14 S, Rng 78 W, 6th P.M., Chaffee County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: Application has not provided stormwater management information. Al] ponded stormwater <br />must be released to the natural stream system within 72 hours, or all work must cease until a <br />substitute water supply plan, or augmentation plan approved by water court, is obtained. <br />COMMENTS: <br />