My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11869
DRMS
>
Back File Migration
>
Revision
>
REV11869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:49 AM
Creation date
11/21/2007 10:26:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Revision
Doc Date
4/28/2003
Doc Name
Permit Issuance Letter
From
Seneca Coal Company
To
DMG
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 5t., Room 215 <br /> <br />Denver, Colorado 80203 DIVISION o r <br />Phone: (303) 866-3567 MINERAL S <br />FAX: (303) 832-8106 & <br /> GEOLOGY <br /> 0.EC LAMATION <br />MINING•SAFETY <br />December 6, 2002 <br /> <br />Robert J. Shevling Bill Owens <br />cnvernnr <br />Seneca Coal Company Greg E. Walther <br />P.O. Box 670 Executive Director <br />Hayden, CO 81639 Ronald W. Cattany <br /> Acting Division Director <br />Re: Proposed Decision <br />Permit Renewal Application No. 4 (RN-4) <br />Seneca II Mine, Permit No. C-1980-005 <br />Dear Mr. Shevling: <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision Package for Permit Renewal <br />No. 4 at the Seneca II Mine. Notice of the proposed decision will be published in the Steamboat Pilot as soon as <br />possible. The first publication will initiate the thirty (30) day public comment period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved renewal materials <br />were sent [o the Office of Surface Mining and [he Bureau of Land Management. The materials should be sent <br />within 15 days of final approval. <br />~.; <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Re sed Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond H~~ please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. The pemlit will not be issued until the Division has received and approved the <br />bond ; .. <br />I <br />If you have any questions, please contact me. <br />`4 <br />Sincerely, <br />Michael P. Boulay <br />Environmental Protection Specialist ``---' <br />MPB/Jrc <br />Enclosure <br />~-~' 1" ~_ <br />C-RN-ON C19N0005 MPB _'00'_IOIN 31638 PM dot <br />
The URL can be used to link to this page
Your browser does not support the video tag.