Laserfiche WebLink
,: <br />IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and <br />date of abatement for the violation, previous violations still requiring abatement and the termination of <br />violations cited during previous inspections. <br />NOV CV-2007-002 Abatement <br />Step 1: No later than Mav 25, 2007, perform grading and maintenance to restore light use road ditching <br />and Channel PM-4C, as necessary to divert upland drainage away from the slide location and <br />into Channel PM-4, in the immediate vicinity of the Culvert PM-10 inlet. <br />Step 2: No later than June 1, 2007, submit a complete technical or minor revision application (as <br />appropriate), addressing plans for repair of the damage caused by the slide and erosion <br />described. In addition, include in the plan any modifications to the approved topography or <br />drainage plan to ensure that rapid melt from deep snow accumulations upslope from the slide <br />area will be safely diverted, to minimize the potential for future slippage or erosion related to <br />snow melt, in the same or adjacent areas along the ridgeline. <br />Step 3. No later than August 2, 2007, implement and complete the plan submitted in the technical or <br />minor revision required by Step 2. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Revised 2/97 <br />7 <br />