Laserfiche WebLink
-` <br />Stipulation No. 20 <br />Within 60 days of completion of the backfilling and grading <br />operation the operator will submit an as built drawing of the <br />reclaimed area clearly showing the final contours with accompanying <br />cross sections. In addition the drawing shall show the location of <br />three stability monuments located on the upslope, midslope, and, <br />toeslope of the backfilled areas which will be used to monitor <br />potential movement of the slope. These monuments shall be monitored <br />annually in the spring of each year with results submitted in the <br />annual reclamation report. <br />