Laserfiche WebLink
:47/02/97 15:54 '8'12087694122 I~CI.A MINING <br />.. ,.,u-wc-~~ wED as :33 ~MECL1i. Dur i s a-S i s e <br />REAMS <br />~-r-. 1iT WEST -ItE%BURG ~ 002/002 <br />~3 964 3348 P. 09 <br />G~NSTRU CTIpN C~ <br />O <br />The following is a cost estimate for concrete and concrete block removal. <br />Estimate is based on equipment accessibility and average rebar. <br />Structure Dimensions Com osAion Gua Unit Unit Cosi Total Cost <br />Concrete Floor 40x5025 Concrete 2000 . Ft. S 1.38 $ 2.720.00 <br />Concrete Floor 15x18x.5 Conuete 270 S . Ft. S 1.38 S 38720 <br />Concrete Pad 15x10 Concrete 150 S . Ft. $ 1.38 5 204.00 <br />Block Buildin 1 Bx30x8 Concrete Blk. 4320 Cu.Ft. $ 0.28 5 1,209.60 <br />Concrete Floor 18x30x.5 Conuete S40 . Ft. $ 1.36 $ 734,40 <br />L .Concrete Pad 90x90x.5 Concrete , 8100 S , Ft, $ 1.36 511,016,00 <br />L ,Concrete Pad 75x10025 Conaete 7500 S . Ft, S 1.36 510,200.00 <br />Concrete Bln 115x2525 Concrete 28 5 . Ft. S 1.36 5 3,910.00 <br />Concrete Bin 115x1225 Concrete 1380 . Ft. 5 7.38 $ 1,876.80 <br />Concrete Bin 7~Q5x.5 Concrete 2100 S . Ft. $ 1.38 $ 2,856.00 <br /> <br /> TOTAL 515,094.00 <br />Respectfully Submitted, <br />Jeny Nelson. Supertntentlent <br />Reams ConsWction Co. <br />D r1 0.... ~r14 Ale4„~ire r`nlnr~r~n R1d99 A7r1~Rf1~i.9RRR <br />