Laserfiche WebLink
• ~ a <br /> <br />reclamation only if the Board ties determined: <br />i. that reclamation required by law to <br />have peen performed upon such lands has not been performed. <br />and <br />ii. that financial warranty forfeiture <br />proceedings described in the act or similar provisions of <br />subsequent lawsr if' any, have Seen initiated. <br />5. The ddc:itiOndl stipulations set forth in the <br />attachetl rider, if any, are incorporated herein by reference. <br />/____/ a) Rider is attached. <br />/_X/ b) No rider is attached. <br />ACGEPTEO AND AGREED: MINED LAND RECLAMATION BOARD <br />MINED La.vC RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />Terra Construction Com~an ~~~ 2~~ <br />------------------E---Y ----------------- -- ---- <br />Operator Division Director <br />Notarization o' Operator's Acknowledgment <br />STATE___ COLORADO __________) <br />~______ ) S5. <br />COUNTY OF JEFFERSON_.________) <br />The fOregOin~g instrument was acknowledged before me <br />finis _7th day of _._April___, 199 by ___ as _ of _, the operator. <br />F.A.S ers V.P,,~ ~e~rra Construction Co. <br />NOTARY PUBLIC /~ <br />-4- <br />