Laserfiche WebLink
BTU EMPIRE CORPORATION -EAGLE 5 & 9 MINES <br />TECHNICAL REVISION TR07-34, SOLID-WASTE DISPOSAL FACILITY <br />TECHNICAL ADEQUACY RESPONSES SUMMARY OF REVISIONS/ADDITIONS (10/07) <br />REVISION/ADDITION DESCRIPTION PLACEMENT INSTRUCTIONS <br />OPERATIONS PLAN -MINE FACILITIES ULE 2.05 <br />Pages 2.05-23 through -31.3 Revised reclamation plan text Replaces Pages 2.05-23 through <br /> addressing solid-waste disposal -3i.s in'voiume 1 <br /> facilit <br />PERFORMANCE STANDARDS -NON-COAL SOLID-WASTE ULE 4.11 <br />Page 4.01-9 through -9.1 Revised text addressing solid- Replaces Page 4.01-9 in Volume <br /> waste dis oral facilit 2 <br />