My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:49 PM
Creation date
11/21/2007 10:24:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Ph. IVc VOL. II Table of Contents
From
Golder Associates Inc.
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -iv- 043-2170 <br />• LIST OF APPENDICES <br />Appendix A Record (As <br />Record Drawing No. 1 <br />Record Drawing No. 2 <br />Record Drawing No. 3 <br />Record Drawing No. 4 <br />Record Drawing No. 5 <br />Record Drawing No. 6 <br />built) Drawings <br />Phase Nc General Composite Overview <br />Phase IVc Secondary Underdrain As-built <br />Phase IVc Top of Soil Liner Fill As-built <br />Phase IVc Leak Detection Trench As-built <br />Geomembrane Record Drawing: Phase IVc Ore Storage Area <br />Phase IVc High Volume Solution Collection System As-built <br />Appendix B Photographic Documentation <br />Appendix B-] Photograph Log <br />Appendix B-2 Documentary Photographs <br />Appendix C Staff Schedule for Golder Personnel <br />Appendix D Weekly Reports <br />Appendix E Technical Specifications <br />Appendix F Surveyor's Certificate <br />Appendix G Subgrade Acceptance Forms <br />Appendix H Concrete Observation and Testing Results <br />Appendix I CQA Laboratory Test Results <br />Appendix I-1 Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix I-2 Compaction Tests <br />Appendix I-3 Soil Liner Fill Permeability Tests <br />• APPENDIX JGEOMEMBRANE QUALITY CONTROL DOCUMENTS AND INVENTORY <br />Appendix J-1 Geomembrane Inventory Control <br />Appendix J-2 Resumes of Installation Personnel <br />Appendix J-3 Geomembrane Resin Quality Control Certificates <br />Appendix J-4 Geomembrane Roll Quality Control Certificates <br />Appendix J-5 Welding Rod Quality Control Certificates <br />Appendix J-6 Geotextile Roll Quality Control Certificates <br />Appendix J-7 FIDPE Pipe Certifications <br />Appendix K OSA G eomembrane Installation Observations <br />Appendix K-1 Conformance Test Results <br />Appendix K-2 OSA Deployment Observations <br />Appendix K-3 OSA Trial Seam Summaries <br />Appendix K-4 Tensiometer Certification <br />Appendix K-5 OSA Fusion Welding Summary <br />Appendix K-6 OSA Extrusion Welding Summary <br />Appendix K-7 OSA DefecURepair Summary <br />Appendix K-8 OSA Destructive Testing Summaries <br />Appendix K-9 OSANnn-Destructive Testing Summazies <br />Appendix L Underground Workings Geosynthetics Observation <br />Appendix L-1 Geogrid Quality Control Certificates <br />Appendix L -2 Geogrid Conformance Test Results <br />• <br />ewunom~omcm-Qneurvczmiwzznawao.zvaxcenrerv~am Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.