Laserfiche WebLink
* • iii iiiiiiiiiiiiiiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanment of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone 13031 866-3567 <br />FAX: (3031 832-8106 <br />M E M O R A N D U M <br />~~ <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />TO: JIM PENDLETON /~ Governor <br />FROM: BOB OSWALD Ken Salazar <br />DATE: AUGUST 3, 1994 Execuine Duenor <br />RE: SNYDER UARRY FILE NO. M-77-210 ADE UACY ISSUES"' long <br />Q / / 4 Di ireClnr <br />TIMELINE <br />Per your request to keep you updated, here is a summary of what I <br />am focusing on as adequacy concerns, and a rough timeline of <br />completion of items by the decision date. <br />I. Adequacy concerns include: <br />* specifications of structures to be removed (and which <br />will remain), for bond calculation; <br />p~- * closure or elimination of mine portals or cave openings <br />which may remain at end of mining, and if any reclamation <br />activities will affect undisturbed/pre-law openings; <br />* better definition of amounts and types of woody species <br />in the base reclamation plan, and enhanced plan; <br />p~~ * treatment of "dump" areas (abandoned equipment, etc.), <br />ie., burial, salvage, removal; <br />U ~~* treatment of the access road, ie., reclamation, removal <br />of asphalt, repaving, and any associated maintenance or <br />drainage issues; <br />* and of course, the criteria for judging the success or <br />failure of the base vs enhanced reclamation plan, both in <br />an incremental sense and at final stages, and any adverse <br />interactions between the two plans. <br />The adequacy review is being conducted currently. No issues <br />have yet been communicated to the applicant. <br />II. Timeline of other items: <br />* surface hydrology review (extra document and supporting <br />drawings included with application), by Aug 12; <br />* bond calculations, pending sufficient information <br />returned by applicant as requested in the adequacy <br />letter, to be completed by Aug 19; <br />* adequacy review completed and letter sent to operator, by <br />Aug 12; <br />* review of <br />* / (pending <br />(j~Q $~4~g¢ review of <br />dmgcorr8.94/1 <br />reclamation criteria, as submitted by operator, <br />timely return of requested items) by Aug 26; <br />comments submitted, by Aug 19. <br />GG ~ W1(i L <br />