My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11498
DRMS
>
Back File Migration
>
Revision
>
REV11498
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:28 AM
Creation date
11/21/2007 10:23:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
EXHIBIT G WATER INFORMATION
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT G <br />i WATER INFORMATION <br />The Amendment No. 8 operations aze not expected to directly affect surface or <br />ground water systems; however, the following discussion is included to provide <br />information on the surface and ground water and confirm that neither will be directly <br />affected. <br />This Exhibit, through reference to the Sections of the Project Description itemized <br />below, contains a description of the ground and surface water conditions for the Cresson <br />Project. This Exhibit contains Drawing G-I which shows surface water drainages and <br />ground water wells for atwo-mile radius from the permit boundary. Drawing G-2 shows <br />registered water rights for springs within atwo-mile radius. The accompanying Project <br />Description and appendices discuss the location of surface water within the project azea <br />or on adjacent land which may be affected by the Amendment No. 8 operations, and <br />drainage and sediment control measures used to manage runoff and protect surface and <br />ground water resources. This Exhibit and the accompanying discussions outlined below <br />also identify any known aquifers, and discuss the ground water system and the potential <br />effects of the mining operations on the ground water system. In addition, a discussion of <br />project water requirements and water supply is included. For a discussion of other <br />permits existing at the site, including the existing permits with the Water Quality Control <br />Division, please see Exhibit M. <br />• The information required as part of Exhibit G is included in various parts of the <br />Project Description in Volume I of this application as outlined below. <br />Section 4.6.1 Hydrology <br />Section 5.0 Mining and Operations Management Plan (Specifically subsections <br />5.7.1.3 and 5.7.2.2) <br />Section 6.0 Valley Leach Facility (Subsection 6.6 and 6.7) <br />Section 8.3 Water Supply <br />Section 9.0 Surface Water Management <br />Section 10.0 Monitoring <br />Appendix I in Volume II also contains a compilation of ground and surface water on site <br />and in the vicinity of the site, and Appendix 9 in Volume VIII provides information on <br />project water agreements. <br />• G-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.