Laserfiche WebLink
.. <br />~! • • <br /> <br />piled and scattered throughout the quarry and the road £rom <br />.. ~ - .. <br />the Garden Road to the quazry.w'as in bad shape, narrow~dnd <br />obstructed in places with boulders and muddy areas. <br />Rhere was a trail or road from the quarry northward <br />to the Ramp art Ranse Road. This road has be_n in existence <br />since 1987. The word "road" must be defined by the evidence., '~' <br />R'his road is described as not being satisfactory for access. <br />There is evidence that some cars and matozcycles also have used <br />road. There is no evidence that the Toad was ever maintained: ~. <br />pictures of the~road indicate that it is more of~a trail. <br />The road to the quarry was realign_d, aridened, ar_d <br />roll areas built, and the~road~surface3 with material.ta'<_n <br />from the quarry. This wor;ccras done by Castle and started <br />:, January 1970, and finishe3 in the spring, so that Apr3.1 15th; <br />1970, a crusher a+as transporEed to the quarry and installed <br />there, and an iron`gate erected on the road. ~ ~.. <br />.. Hor:c at the auarrv.in 1970 was cleaning up. the.sJ.te <br />and sellirq same o~ the material.extracted from the quarry ~by•' <br />trte:previaus operator. The open area of the quarry~was~exterds <br />. . <br />eastward so as to erpose ten to eleven acres. '. <br />• Castle had the land tested and surveyed for mineral <br />deposits. The suzs•ey results sho:r ore reserves in~the amount <br />of 1,330,000 tons of high calcium limestone and 16,2b0,000 ton. <br />of dolomitic aggregate lime. Across Ftilliams Canyon, there is <br />an additional five million tons of dolomitic aggregate in Cast <br />~ . <br />owned land. <br />Castle has a plan for development of these reserves <br />by underground mining reached by tunnel openings from the <br />rlVNxry efleninn. The nuo rev opCniPn S±ould be eYP9!!~°$ Yo <br /> <br />a <br />