My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23254
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:38 PM
Creation date
11/21/2007 10:23:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Enforcement
Doc Date
5/19/1994
Doc Name
EAGLE 5 AND 9 MINES PN C-81-044 SETTLEMENT AGREEMETN NOV C-94-003
From
DMG
To
CYPRUS EMPIRE CORP
Violation No.
CV1994003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Nalural Resources <br />1313 Sherman SI., Rrwm 215 <br />Denver. CO 80203 <br />Phone: (3011 H66 3567 <br />FAX: (3031 872 8106 <br />SETTLEMENT AGREEl~NT <br />Cessation Order No. <br />of Sara <br />ti~ R <br />. ~+~~ <br />~ rB )6 <br />Ruv ROmei <br />Guvemor <br />Michael B. Long; <br />Dnn~inn D~reanr <br />Notice of Violation No. C-94-003 <br />Mine:Eagle No. 5 and 9 Permit No. C-81-044 <br />Permittee: Cyprus Empire Corporation <br />Mailing Address:P.O. Box 68 <br />Operator: (If other than Permittee): <br />Mailing Address: <br />County: Moffatt Type of Mine: Underground/Federal <br />The Division of Minerals and Geology ("The Division") issued a certain <br />Notice of Proposed Amount of Civil Penalty, and the operator requested <br />a conference thereon, as authorized by C.R.S. 1973, 3~1-33-123(8). <br />The requested conference having been held as required by law, on <br />May 12. 1994, the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be $750.00 <br />2. The penalty shall be paid to the Division b;~ the operator not <br />later than 30 days from the date this agreement is signed by <br />all parties; <br />3. Payment of such penalty by the operator shall constitute a <br />waiver of all further rights to review of such penalty or of <br />the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator <br />within ten days after the closing date of such conference, which date <br />is set forth below opposite the signature of the Conference Officer. <br />If not so signed, the Division will fix the penalty air whatever amount <br />it deems appropriate, based upon the factors referred to in C.R.S. <br />1973, 34-33-123(8)(d). <br />OPERATOR: <br />DATE: <br />DATE: S,JI l' 9~ <br />Penalty Adjustment Reviewed <br />IHUIe 5.04.31411c11 <br />C.H.S. 34-33-1431 H)IUltll <br />By: <br />DIVISION OF NINSRALS AND GEOLOGY: <br />By 2 "74,~ <br />onference ffFicer <br />By -,- <br />Division Direr_tor ~ti, i,q g L <br />
The URL can be used to link to this page
Your browser does not support the video tag.