My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23240
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:38 PM
Creation date
11/21/2007 10:23:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Enforcement
Doc Date
6/1/1995
Doc Name
10 DAY NOTICE 95-020-179-002 TV 3 SENECA II-W MINE C-82-057
From
DMG
To
OSM
Violation No.
CV1995007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />At this time (and at the time of the inspection which resulted in the TDN), the Colorado <br />program requires that haul roads be certified if required by the Division for good cause <br />shown. All certifications required by DMG have been submitted by the operator. <br />Consequently, the alleged violation does not exist. DMG believes it has responded to TDN <br />95-020-179-002 in an appropriate manner. <br />DMG has instructed the operator to revise the haul road certifications in question by June <br />15,1995. By doing so, the operator will be in compliance with the amended version of Rule <br />4.03.1 before that rule becomes effective. Among the certification exhibits to be revised is <br />Exhibit 13-13.2, which was the subject of alleged violation #2 of this same TDN. AFO <br />requested that DMG provide dates by which the permittee will be required to revise Exhibit <br />13-13.2. DMG has instructed the operator to revise the road certification exhibits by June <br />15, 1995. A copy of an excerpt from a May 5, 1995 DMG inspection report instructing the <br />operator to revise this and other exhibits is enclosed for your reference. DMG will render <br />a decision on the revision of the road certifications within thirty days of submittal. <br />If you have any questions or need additional information, please contact me. <br />• Sincerely, <br />•~`~~ <br />Susan J. M on ~ <br />Coal Program Supervisor <br />enclosure <br />cc: Larry Routten <br />Wally Erickson <br />m:\coal\Ipr\060195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.