Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 05/21/2003 <br />User: JDl <br />State :Colorado <br />County :Fremont <br />Site :Penrose Ranch Pit <br />Permit/job# : M-1992-016 <br />Abbreviation :none <br />Filename : M016-002 <br />Agency or organization name :OMG <br />Permit or other job action :Phased reclamation <br />Task description :Create 3:1 slop <br />HOURLY EQUIPMENT COST <br />with backfill material <br />Basic machine :Cat D6R LGP - 6S Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $26.40 NA <br /> OperatingcosUhour : $36.30 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cosUhour : $24.01 NA <br /> Total unit cosUhour : $86.71 Total fleet cosUhour : $$6.71 <br />,. ,., <br /> <br />MATERIAL QUANTITIES ,. <br />-, <br />Initial Swell Loose <br />volume : 5,300 LCY factor : NA volume : 5,300 LCY <br /> <br />Source of estimated volume :calculation <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION s; ;: ;: ;: <br />Job Conddion Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Matorial consistency description : Job efficiency : 0.83 (lshifUday) <br />Loose stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.42 (Cat HB) <br />Average push gradient : 25.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,300 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,850 Ibs/LCY Net correction : 0.22 <br />Weight description <br />Decomposed rock- 25% Rock, 75% Earth Adjusted unit production : 9724 LCYIhr <br /> Adjusted fleet production : 97.24 LCY/hr <br />100 acros <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 54.50 Hours <br />Unit cost : $0.892 /LCY Total job cost : .$4,726 <br />