My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-21_REVISION - M1992016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992016
>
2003-05-21_REVISION - M1992016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:22 PM
Creation date
11/21/2007 10:23:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992016
IBM Index Class Name
Revision
Doc Date
5/21/2003
Doc Name
Cost Summary Form
From
DMG
To
DMG
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 006 <br />Date : 05/21/2003 <br />User: JDt <br />State :Colorado <br />County :Fremont <br />Site :Penrose Ranch Pit <br />Agency or organization name : DMG <br />Permit or other job action :Phased reclamation - 100 acres <br />Task description :Rip plant and stockpile areas <br />HOURLY EQUIPMENT COST <br />PermiUjob # : M-1992-016 <br />Abbreviation :none <br />Filename : M016-006 <br />Basic machine :Cat D6R LGP - 6S Horsepower : 185 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per tlay <br />Attachment no. 2 :3-shank ripper <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 30.00 acres Rip depth (ft) : 1.00 Volume : 48,400 BCY or CCY <br />Source of estimated quantity :program <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unatljusted production <br />NA feet/second <br />NA cu. yds./hour <br />1.00 feet/pass <br />6.58 feet/pass <br />300.00 feet/pass <br />88.00 feet/minute <br />0.25 minutes/pass <br />0.743 acres/hour <br />1,198.84 cu. yds./hour <br />Unadjusted production <br />per selected method : 1,198.84 cu. yds./hour <br />Site altitude : 5,300 feet <br />Altitude adjustment ; 1.00 (Cat HB) <br />Job efficiency factor ; 0.83 (1 shifbday) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production <br />Adjusted fleet production <br />995.04 <br />995.04 <br />cu. yds./hour <br />cu. yds./hour <br />JOB TIME AND COST - -- --------- <br />Fleet size : 1 dozers) Total job time : 48.64 hours <br />Unit cost : $0.099 per cu. yd. Total job cost : ai4,815 <br />
The URL can be used to link to this page
Your browser does not support the video tag.