Laserfiche WebLink
PS. I was originally concerned that we would need to bond for stockpiling of coal at the loadout <br />(assuming that if we were to assume responsibility, any remaining coal would need to be disposed <br />of), But I believe our current policy is that we do not bond for stockpiled coal. Is that correct?. If so, <br />I don't believe resumption of operation at the loadout would create additional disturbance that would <br />need to be bonded. <br />