My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11400
DRMS
>
Back File Migration
>
Revision
>
REV11400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:22 AM
Creation date
11/21/2007 10:22:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Revision
Doc Date
5/22/1998
Doc Name
BULLDOG MINE RECLAMATION PROJECT 9360 LEVEL ADIT CLOSURE MONITORING PLAN
From
HOMESTAKE
To
DNR
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />t <br />1 <br />1 <br /> <br />3 <br />2 ADIT PLUG CONSTRUCTION MONITORING <br />The overall objective of the adit plug construction monitoring is to continue to monitor water <br />management activities, to collect additional baseline water data from Windy Gulch and to assess <br />plug performance prior to initiating long term monitoring. The monitoring described below will be <br />conducted during the period of plug construction and up to the time in which conditions around the <br />adit plug are considered stable. After stable conditions are achieved, the monitoring program will <br />be modified as appropriate (see Section 3). A summary of the adit plug construction monitoring <br />program is provided in Table 2.1. Each measurement is described below. <br />Table 2.1 Adit plug construction monitoring program <br />Measurement ID Description Frequency Period Comments <br />Water sample Trench- Water quality of Monthly When trench is Sample taken from <br /> Inlet influent to in operation weir box at trench <br /> infiltration trench inlet <br />Flow Trench Infiltration trench Daily When trench is Measurement <br /> flow influent rate in operation taken using weir <br /> box at trench inlet <br />Water level SP-1 $ Water level in Daily When trench is <br /> SP-2 trench standpipes in operation <br />Water level VP-1 8 Water level in Weekly When trench is <br /> VP-2 vadose zone in operation <br /> piezometers <br />Visual Inspection of trench Daily When trench is <br />inspection to see if capacity is in operation <br /> being exceeded <br />Water sample WGWB Water quality of Monthly On-going Windy Gulch flow <br /> Windy Gulch at starting in April measurement <br /> rectangular weir 1998 taken <br /> simultaneously, if <br /> practical <br />Pressure APP Water pressure Daily, until When atlit More frequent <br /> behind adit plug pressure seepage relief monitoring if <br /> stabilizes, valve is closed pressure exceeds <br /> then weekly 11 psi <br />Visual Possible seepage Daily, until While plug is If seepage <br />inspection around adit plug pressure accessible observed, flow <br /> stabilizes, rates to be <br /> then weekly measured using <br /> infiltration trench <br /> weir <br />Visual Possible Daily, until On-going <br />inspection development of pressure <br /> springs and seeps stabilizes, <br /> near portal then weekl <br />
The URL can be used to link to this page
Your browser does not support the video tag.