Laserfiche WebLink
1 <br />1 <br />t <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />CONTENTS <br /> <br /> Page <br />1 INTRODUCTION 1 <br />1.1 Background 1 <br />1.2 Purpose and scope of monitoring plan 2 <br />2 ADIT PLUG CONSTRUCTION MONITORING 3 <br />2.1 Infiltration trench monitoring 4 <br />2.2 Windy Gulch monitoring 5 <br />2.3 Adit plug monitoring 6 <br />2.4 Reporting 6 <br />3 LONG TERM ADIT MONITORING 7 <br />3.1 Infiltration trench monitoring 7 <br />3.2 Windy Gulch monitoring 8 <br />3.3 Adit plug monitoring 9 <br />3.4 Tracer test monitoring 9 <br />3.5 Reporting 9 <br />TABLES <br />2.1 Adit plug wnstruction monitoring program 3 <br />2.2 Parameters for Bulldog Mine water sample analyses 4 <br />3.1 Long term adit monitoring program 8 <br />FIGURE After page <br />1.1 Bulldog Mine location map 2 <br />ATTACHMENT <br />A Water quality sampling procedures <br />cvcwrm~crnx~mn~orruraooc <br />