Laserfiche WebLink
E3CHIBIT D, Nyle McVey Pit #16 <br />Mining Plan <br />iiiiiiiiiiiiiiiiii <br />RECEIVED <br />SEP 19 2001 <br />Division of Minerals and Geology <br />a) the material will be moved by front-end loaders and trucks, a bull dozer will be used in <br />location where loader is impractical due to loose footing <br />b) the overburden will be moved by front-end loader and bulldozer and stockpiled <br />for use in reclamation <br />c) there will be no water diversions and impoundment's necessary at this pit, aJl <br />dikes and berms will be for safety and erosion control <br />d) the area to be disturbed at any one time will not exceed 40 acres <br />e) mining will start with this permit and continue sporadically during the years as required, <br />reclamation will be on going as tl~e site is mined, the active area in the Southwest corner <br />will be continued until exhausted, active mining will move to the North and to the East <br />reclamation will begin, will pull 6" to l2" of topsoil from stockpile at pit site. Reclamation <br />will proceed as mining moves to the North and to the East with topsoil stored on-site to be <br />planted with native grasses with ground sloped 4:1 where necessary <br />~ (i) material to be mined is gravel and sand of varying deptlt with none to 3 ft of topsoil <br />overburden <br />(ii) straight below material is rock and will not be disturbed <br />g) the primary commodity will be gravel for use as road surfacing and the secondary <br />commodity will be clay for use as road bed materials <br />h) there will be no refuse, acid or toxic producing materials exposed during <br />mining <br />