Laserfiche WebLink
J. J. Dudash - 2 - September 3, 1999 <br />The following revised pages are enclosed. <br />PaaelRef. Comment <br />Pages 29-33 Updated list in the other licenses and permits section of the permit. <br />Pages 1 - 27 Updated operations description to explain the mine has air permits <br />for 1.0 million tons per year and the loadout can handle up to 5.0 <br />million tons per year. <br />Air Permits 1) 11DL252-2 2) 11DL252-5 3) 11DL252-6 4) 11DL252-7 <br />5) 11DL252-10 6) 12DL595 7) 83DL062-1F 8) 83DL299F <br />9) 90DL417F 10) 93DL1622 <br />State Highway Access Permits - 1) 399055 2) 399056 3) 399057 <br />Revised table of contents for Volume 7 to include access permits <br />Water Depletion Estimate -Windy Gap Process - 3 pages -Volume 9A <br />Please call if you have any questions. <br />Sincerely, <br />~~~~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />