My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23224
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:37 PM
Creation date
11/21/2007 10:22:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/12/1993
Doc Name
REVISED MEMO OF UNDERSTANDING BATTLE MOUNTAIN RESOURCES INC
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />9. All sampling, analysis and reporting shall comply with the approved <br />TR-006 protocol. <br />10. The third party sampling contractor shall document its compliance with <br />the approved TR-006 protocol. <br />D. Reports <br />1. A summary report will be prepared subsequent to the completion of <br />each sampling event and the receipt of the analytical results from the <br />chosen laboratory. <br />2. The summary reports will include a summary of the sampling activities, <br />sampling observation documentation, "chain of custody' documentation, <br />the verbatim analytical results from the laboratory, with, comments on <br />unusual or unexpected results, and recommendatio}~s for minor <br />sampling changes, if indicated by the analytical results. <br />E. Malysis of Samples <br />1. Samples collected hereunder shall be analyzed by th$ independent <br />analytical laboratory designated by DMG for the followi g parameters: <br />Total Cyanide, WAD Cyanide e~ Coppery arid`Nitrafc`;:: itrte (second <br />and;third:<satriP[ing;<z,QUndS~;oi'~y} in accordance with the approved <br />analytical protocol set forth in TR No. 006. <br />2. In accordance with the approved TR No. 006 protocol,'"field blanks", <br />"rinse blanks", and "duplicate samples" will be submitted for analysis by <br />the third party sampling contractor, at the contractor's dpscretion, with <br />the concurrence of the DMG project manager. <br />3. If analytical interferences are suspected to exist, tlye third party <br />sampling contractor may direct the analytical laboratoryy to perform <br />analysis for additional parameters, with the concurrenc$ of the DMG <br />project manager, after notification of BMRI. <br />F. Submittal of Invoices <br />1. The Contract for Environmental Sampling Services requires that <br />invoices be submitted to DMG's project manager. <br />2. The DMG project manager shall review and approve the invoice(s), <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.