My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11374
DRMS
>
Back File Migration
>
Revision
>
REV11374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:21 AM
Creation date
11/21/2007 10:22:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
4/16/1996
Doc Name
SENECA II-W MINE PN C-82-057 TR 25
From
SENECA COAL CO
To
DMG
Type & Sequence
TR25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yS <br />/C,`// \ 999 <br />~s~ oE~ Seneca Coal Company <br />April 15, 1996 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 R~rFl~ir_n <br />Denver, CO 80203-2273 <br />qPR ~) u lyy6 <br />R8: Seneca II-W Mine Permit C-82-057, TR25 <br />Dear Ms. Crosby: <br />Division of Mmeraw a ~ ~.~,ir <br />Enclosed please find three copies of an application for TR25 to the <br />Seneca II-W Mine Permit C-82-057. This technical revision provides <br />the abatement plan for NOV C-95-023, updating the postmining <br />topography and reclaimed drainage channel designs and calculations. <br />Per your letter dated January 24, 1996, item number 4 requested <br />Seneca include a revised schedule with completion dates for <br />backfilling and grading, topsoilinq and seeding. The following <br />schedule is provided with a current abatement deadline of July 12: <br />• -Submittal of Revision April 15 <br />-Approval of Revision May 15 <br />-Topsoil Removal June 1 <br />-Backfilling and Grading July 1 <br />-Topsoil Replacement July 12 <br />Seeding will occur in the fall when all other revegetation <br />activities are initiated at Seneca II-W. This schedule is tentative <br />and is based on the revision being approved within 30 days. We ask <br />that you phone us with any questions on the enclosed material <br />initially before sending us any correspondence to expedite the <br />review process. This entire schedule is based on the date work can <br />be initiated following approval. An additional extension may be <br />needed to complete field abatement of the violation. Seneca will <br />notify the division as each phase of the field work is <br />accomplished. <br />One item Seneca would like approved for this project during the <br />topsoil removal phase is that the topsoil material be windrowed on <br />the perimeter of the area to be redisturbed. This will help in <br />minimizing how much topsoil is hauled to a stockpile. Secondly, it <br />will save time during topsoil removal and replacement. <br />• <br />Seneca Coal Company P.O. Drawer D Hayden, Colorado 81639 <br />Telephone (970) 276-3707 FAX (970) 276-3014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.