Laserfiche WebLink
~~ ~ <br />~/~ ~ <br />- 1' v <br />• <br />• iii-iiiiiiiiiiiiiiii, <br />PERMITTED, 110(1), 110(~~, .,.999 ING OPERATIONS <br />Presentation Form <br />General Information: <br />Loukonen Quarries <br />Date: May 25, 1994 Commodity: Flagstone <br />File No: M-81-277 Acreage: 9.0 <br />Operator: Loukonen Bros. Stone Co. Specialist: Bill York- <br />Feirn <br />Location: Sec. 6, T3N, R70W, 6th P.M., Existing Bond: $2,580 as <br />CD <br />Natuy~/ and Duration of Violation: <br />~/ Mining and Mining-related activities outside the permit boundary <br />~_~+ + ^'~~ ~ ----- 5.81 acres outside permit bdry. <br />Duration: From 4/7/94 Inspection to 5/25/94 Board Meeting = 49 days <br />Seriousness: Zones <br />D C B A <br />(A) Administrative Violation, or Some On-Site Damage <br />(B) Little Off-Site Damage, Moderate On-Site Damage, No Health or <br />Safety Hazard <br />(C) Little Off-Site Damage, Significant On-Site Damage, and/or <br />Possible Health or Safety Hazard <br />(D) Off-Site Damage, and/or Significant Health or Safety Hazard <br />History of Violations in Past Twelve Months: None <br />Staff Recommendation: Find a violation for either: <br />(1) Mini witho a permit and violation of C.R.S. 34-32-109(1), <br />(2) an 7 and Rule 2.1 of the Rules and Regulations of the <br />Colorado d Reclamation Board. <br />OR <br />' / (2) Mining and mining-related activities outside the permit boundary <br />I/\ and violation of C.R.S. 34-32-116(7)(h) and Rule 6.1(2) of the <br />Rules and Regulations of the Colorado Mined Land Reclamation Board <br />and Desist: Ye(e ,~unt i/l cAO,rrecttive actions are completed. ~ ~" ~ ~~~ <br />~l~ D~A'F"S(d~- ~1..A- ~P_~~ ~Yv7ivv+s~y~+ew~ <br />orrective Actions: (1) Submit a compete amendment or conversion <br />application to the Division by 6/24/94 which includes all disturbed <br />Lando by mining and mining-related activities. (2) Obtain an <br />approved amendment by 7/24/94 or an approved conversion by 9/24/94. <br />Civil Penalty Range $50 - $200 per day. If $50 per day is added for <br />history, daily penalty may not exceed $150 + $50: ~ ~nS~ ~~ <br />( $SO - $150/day ) 49 days = $2,450 - $7,350 <br />~~~~f~~ <br />c:\wp51\loukonen.pre ~, <br />