Laserfiche WebLink
Stipulation 5 <br />ROCKCASTLE COAL COMPANY SMALL SUBMIT AN ASSESSMENT OF APPROX UtATE <br />ORIGINAL CONTOUR AT PITS 5 AND 6 TO THE DI`lISION BY SEPTEMBER 15, 1989. <br />THIS SHALL INCLUDE CERTIFIED AS-GUILTS OF THE ?DST-MItJING TOPOGRAPHY, <br />A COh1PARISOtJ ',JITH PREidINING TOPOGRAPHY, AND A DISCUSSION OF EROSIONAL <br />STABILIT'l, COt•1PATIBILITY IJITH THE POST-MINING LAND USE, AtJD INTEGRATION <br />~,JITH THE LOCAL TOPOGRAPHY PER RULES 4.14.2(1) AND 4.27.3(3). <br />Stipulation b <br />ROCKCASTLE COAL COt1PANY SHALL AT A MINIMUM SUBMIT EITHER 1) ACCEPTABLE <br />DITCH CALCULATIONS FOR PITS 2 AND 3 OR 2) A COMPLETE BOND RELEASE PACKAGE <br />FOR PHASE I AND II BOND RELEASE FOR PITS 2 AND 3, 8Y SEPTEt48ER 15, 1989. <br />THE 30ND RELEASE PACKAG'c MAY ALSO INCLUDE A BOND RELEASE REQUEST FOR PITS <br />1, 5 AND o. <br />Stipulation 7 <br />ROCKCASTLE COAL COMPANY SHALL INCREASE THE BOND TO 5748,787.00 WITHIN <br />THIRTY (30) DAYS OF THE DI4ISi0N'S DECISION, TO C04ER ANTICIPATED <br />RECLAt4ATI0N COSTS AT THE GRASSY GAP MINE. <br />/en <br />8190E <br />~` ~~ J ~)~ ,~ U C ~'~~c <br />r ~ <br />/ .~ <br />~~ <br />`J 1. ~,l \ r~` <br />