My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23110
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:34 PM
Creation date
11/21/2007 10:20:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Enforcement
Doc Date
2/22/1995
From
MI VIDA ENTERPRISES
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- <br /> <br />III II~IIIIII~~IIIII MI vIDA ENTERPRISES <br />P.O. Box 1523 <br />Longmont, Colorado 80502 <br />(303) 651-2985 <br />Mr. Michael B. Long <br />Division Director <br />Division of Mines and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Dear Mr. Long, <br />~FC,E~~ED <br />1-td Z 2 }995 <br />piv;soon o' ~~n'netats ~` Ge01o9Y <br />February 20, 1995 <br />Mi Vida Enterprises received the attached copy of the public notice for Colina Oro <br />Molina's application for a Limited Impact (110) Reclamation Permit for the Gold Hill Mill on <br />February 9, 1995. <br />As you know, Mi Vida Enterprises has not had anything to do with the milling <br />operations conducted by Colina Oro Molina (COM, Inc.) at the Gold Hill Mitl since Mr. J. <br />Wayne Tatman took possession of the site on October 23, 1990. Until his recent rustication, <br />Mr. Tatman was empowered by his sister, Gwen Tatman Fraser, with operation control and <br />permit compliance at the Gold Hill Mill. <br />Under the terms of the Milling Contract between COM, Inc. and Mi Vida Enterprises <br />dated February 13, 1991, COM, Inc. assumed responsibility for complying with all <br />governmental permits, approvals, and regulations governing its milling operations at the Gold <br />Hill Mill. So long as the Milling Contract is in force and effect, COM, Inc. has access to the <br />surface of the White Cloud and Wynona mine claim group for the purpose of disposing of <br />tailings in the tailings pond and for storing water underground in the Hazel A., Wynona, and <br />Times mines. COM, Inc. is supposed to diligently comply with any and all legal or permit <br />requirements for the use of these water storage rights and the tailings pond. Under the terms <br />of this Agreement, COM, Inc. is also obligated to plan for the construction of additional <br />tailings pond capacity to standards required by applicable laws, regulations, and permits. Mi <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.