Laserfiche WebLink
at stations 39+45 (culvert YB-3), 54+59 (culvert YB-6), and 60+00 (15.32% grade <br />point), to alleviate any concerns the Division may have. <br />5. The regulatory definition of roads includes ditches and the entire azea within the right- <br />of-way; therefore, the revision must provide certification that the drainage ditches and <br />culverts aze installed according to the design in the permit and consistent with the <br />regulations. Abatement of the violation will require that the ditches and culverts will be <br />stable with the flow or drainage from portion of the haul road that is steeper than the <br />design. Also, certification is required that the drainage ditches and culverts aze installed <br />according to the approved design and that they conform to the regulations. <br />Please feel free to call me with any questions. <br />Sincerely, <br />~~G~ <br />Jim Burnell <br />Environmental Protection Specialist <br />