My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV11115
DRMS
>
Back File Migration
>
Revision
>
REV11115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:22:06 AM
Creation date
11/21/2007 10:20:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/30/1996
Doc Name
COLOWYO COAL MINE C-81-019 MR-36 MIDTERM REVIEW INFORMATION
From
DMG
To
COLOWYO COAL CO LP
Type & Sequence
MR36
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~iiiiiiiiiiiiiiuiu <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Ucpanmrm u(Nalu ral Resources <br /> <br />I { I ]Sherman 51., Room 21 5 ~ <br />Drover. Colorado ri0203 II~~ <br />Phunc~ 1IU tl ri66-7567 <br />I AX 11071 H l?-N 106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> Rny Rnmrr <br />January 30, 1996 c°°~"n"' <br /> lamrs S. Ln<Mu•a0 <br /> EiPl llll\l' ~)i~i't lr ri <br /> MichaelH Inr~t <br />Mr. Jim Kiger o~~~s~nnrnrl•I~rrl <br />Colowyo Coal Company L.P. <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />RE: Colowyo Coal Mine (C-81-019) <br />MR-36; Mid[erm Review Information <br />Dear Mr. Kilter, <br />The Division of Minerals and Geology received your minor revision application (MR-36) <br />to incorporate modified pages into the Colowyo Permit. The application was received on <br />January 24, 1996 and deemed complete for purposes of filing on January 30, 1996. <br />The minor revision application addressed questions 1, 2, 3 and 4 of the midterm review <br />conducted May 8, 1995. Colowyo responded to the remaining questions (5-20) in the form <br />of a letter to the Division. Colowyo and the Division have agreed to discuss these remaining <br />questions in a meeting to be held on Monday, February 5, 1996. Any additional information <br />required, as a result of this meeting, shall be submitted as a separate revision to the permit. <br />The Division has one concern regarding the revised pages; <br />Question 1 in the midterm review requested pre-mining and post-mining maps for the <br />northern area of the mine. Colowyo responded stating that Map No. 1 shows pre-mining <br />contours, and Map No. 38 shows the post-mining contours of the northern area of the <br />operation. It appears that Map 38 depicts the existing configuration of the northern area <br />(mainly the warehouse area and the gossard loadout). This map does not show the post- <br />mining contours of the area, or the structures to be removed (buildings and ponds). <br />Colowyo revised page 2.05-37 to state that the Bonding Calculation Map (Map 38) shows <br />post-mining contours. As mentioned above, this map does not reflect the post-mining <br />configuration of the northern portion of [he mine. This is one issue that the Division and <br />Colowyo need to discuss during the February 5, 1996 meeting. In the interest of approving <br />
The URL can be used to link to this page
Your browser does not support the video tag.