Laserfiche WebLink
C <br /> <br />Mr. Mark Kerr - 2 - August 20, 1993 <br />8. Please provide a bond estimation for reclamation of the areas not <br />included in the original bond, such as the SAE area and any new <br />sumps and ditches. <br />9. Exhibit kk still has the one 36 inch culvert shown. Please update <br />Exhibit kk to show ? - 24 inch culverts. <br />10. The impoundment at the SAE is considered a primary sediment control <br />structure, meaning no other sediment control structure exists <br />downslope for that drainage basin. According to Regulation <br />1.04(115), this qualifies the impoundment as a sedimentation pond. <br />Therefore, pursuant to Regulation 4.05.6(10), designs and a <br />certification are required. In addition, pursuant to Regulation <br />4.05.6(13), inspections are required. Please submit designs for <br />the SAE sedimentation pond, with a certification and inspections to <br />follow. <br />Items nos. 4, 5, 6, 7 and 10 have already been discussed with Greg Lewicki, <br />the engineering consultant for this technical revision. <br />If you have any questions, please call me. <br />Sincerely, <br />XJoseph J. Dudash <br />Reclamation Specialist <br />JJD/amm <br />cc: Dan Hernandez (DMG) <br />Greg Lewicki <br />8550E <br />