Laserfiche WebLink
~~ <br /> <br />-6- <br /> <br />-~ <br /> <br />Location 1n Appltcatlon <br />INFORMATION CATEGORY NARRATIVE NAPS <br />2.05,3(3) Mine Facilities <br /> 2.05-6 <br />2.05,3(4) Ponds, Impoundments and <br />Diversions 2.05-9 lisp 13 6 14 <br />2.05,3(5) Topsoil (removal and <br />storage) 2.05-19 Map 15 b 16 <br />2,05.3(6) Overburden <br /> 2.05-23 <br />2.05.3(7) Coal Handitng Structures <br /> 2.05-23 <br />2.05.3(8) Coal Processtng Haste and <br />Hon~oal Processing Waste 2.05-26 <br />2.05.3(9) Underground Development <br />xaste z.os-43 <br />2.05.3(10) Return of Coal Processing - <br />Haste to Abandoned <br />NoriH ngs z. os-44 <br />2.05,4 Reclamation Plan z.os-44 <br />2.05.4 (2)(a) Timetables <br /> 2.05-44 <br />~,.05.4(2)(b) Reclamation Cost Estimates) <br />y~ 2.05-45 <br />2.05.4 (2)(c) Bac1cf111ing and Grading *Postinining <br /> topography - <br /> z.os-4s 2.05.4 (2)(c) xap ~ <br />2.05.4 (2)(d) Topsoil (Redistribution) <br /> 2.05-46 <br />2.05.4 (2)(e) Revegetation <br /> 2.05-47 <br />2.05.4 (2)(f) Disposal of Debris. Actd- <br />Forning and Toxic-Forning <br />NatertaTs z.os-So <br />,~ <br /> <br />