My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22912
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:28 PM
Creation date
11/21/2007 10:17:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Name
SETTLEMENT AGREEMENT
Violation No.
CV1997003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SETTLEMENT AGREEMENT <br />Cessation Order No.: <br />Notice of Violation No.: C-97-003 <br />• <br />Mine: Yoast Mine Permit No.: C-94-082 <br />Permittee: Seneca Coal Comoanv <br />Mailing Address: P.O. Drawer D <br />Havden. Colorado 81639 <br />Operator: Ilf other than Permitteel: <br />Mailing Address: <br />County: Routt Type of Mine: Surface\Federal <br />The Division of Minerals and Geology ("the Division"1 issued a certain Notice of Proposed Amount <br />of Civil Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 <br />34-33-123(8). The requested conference having been held as required by law, on <br />Mav 20, 1997 ,the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be S 1,350.00 , <br />2. The penalty shall be paid to the Division by the operator not later than 30 days <br />from the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further <br />rights to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the <br />closing date of such conference, which date is set forth below opposite the signature of the <br />Conference Officer. If not so signed, the Division will fix the penalty at whatever amount it deems <br />appropriate based upon the factors referred to in C.R.S. 1973, 34-33-1231811d). <br />DATE: <br />OPERATOR: <br />By <br />DIVISION OF MINERALS AND GEOLOGY: <br />DATE: Mav 21, 1997 By ~...ii ~ -y ~ s~~ <br />onference Officer <br />Penalty Adjustment Reviewed By <br />(Rule 5.Oa.3lallc)1 Division Director <br />C.R.S. 34-33-123(81(cl and Id) <br />m:\coelbh ere\f orme\5016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.