Laserfiche WebLink
disturbance, and to include a topsoil salvage plan and alternative source of topsoil in the 112c <br />Extraction Permit application, which much be approved within 180-days of the signed Board <br />Order. The Board hereby orders the Operator to pay civil penalties in the amount of <br />$5,000.00 based on $100.00 per day calculated from the date of the Division inspection, <br />September 28, 2004, through the date of the Boazd hearing, December 15, 2004, a total of 50 <br />days. All but $100.00 of the civil penalties shall be suspended if the Operator undertakes the <br />prescribed corrective actions in a timely manner, as described herein. <br />DATED this z/ day of Jf~-~c.,(J~ `~ , 2005. <br />FOR THE COLORADO MINED LAND RECLAMATION BOARD <br />Dan Ellison, Acting Chair, Mined Land <br />Reclamation Board <br />