Laserfiche WebLink
sheet t of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />Task # : 09d State : Colorado Permiflob # : M-1977-342 <br />Date : 05/21/2002 County :Grand Abbreviation :none <br />Usar : ESC Site :Henderson Mine Filename : M342-09d <br />Permit or other job action :Reevaluate amount o1 required bond <br />Task description : Load/haul/spread topsoil from Area 2i to Tailings Pond <br />HOURLY EQUIPMENT COS7 Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck : Cat 769C (1996) <br />-Loader : CAT 988E std. liff (1996) <br />Support equipment -Load area : NA <br />-Dump area : Cat D9R - 9SU <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker. 5.000 Gal. <br />Cost Breakdown : rucWLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer grader misctruk <br />% Utiliza#on-machine : 100 93 NA 100 30 30 <br />-Ripper attachment : NA NA NA 0 0 NA <br />Ownership costMour: $43.89 $44.45 NA $54.81 $40.78 $24.42 <br />Operating cosVhour: $53.04 $59.13 NA $95.93 $13.24 $12.59 <br />Ripper op. cosVhour : NA NA NA $0.00 $0.00 $0.00 <br />Operator cost/hour : $24.03 $28.18 NA $2799 $28.18 $23.61 <br />Unit subtotals : $120.97 $131.76 NA $178.72 $82.20 $60.62 <br />Number of units : 7 1 0 1 1 1 <br />Group subtotals : Work : $978.54 Support : $178.72 Maintenance : $142.82 <br />Total work team cost/hour : $1,300.08 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 754,000 LCY factor : NA <br />Source of quanGry take-off :Annual Reclamation Re, <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis : Truck I <br />Loose <br />volume: 754,000 LCY <br />Total cost : $0 <br />me) Basis <br />Material weight : 2,100 pounds/LCY Struck volume <br />Descr.: Earth -loam Heaped volume <br />Rated payload : 80,260 pounds Average volume <br />Payload capacity : 38.22 LCY Adjusted capacity <br />Final adjusted track capacity based on specific number of loader passes <br />LoadlhgJool Caoaclty • Jo o Ilion orr do <br />Ratetl rapacity (nom. heaped) : 8.000 LCY Truck <br />Descr.: Loose material - 1"and over (85 - 90%) Altitude adj.: 0.970 <br />Bucket fill factor : 0.875 Job efficiency : 0.830 <br />Adjusted bucket capacity : 7.000 LCY Net correction : 0.805 <br />ZG90 LGY <br />30.90 LCY <br />26.90 LCY <br />26.90 LCY <br />28.00 LCY <br />Site altitude (ft.) : 8,700 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shiWda <br />0.830 <br />