Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Task # <br />Date <br />User <br />Agency or organization name :OMG <br />09a State :Colorado <br />06/27/2002 County :Grand <br />ESC Site :Henderson Mine <br />Permitlob # : M-1977-342 <br />Abbreviation :none <br />Filename : M342-09a <br />Permit or other job action :Reevaluate amount of required bond <br />Task description :Haul Stockpiled Surge Material (/rom Mill Site) to Tailings Pond <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Descrption <br />Truck/loader team -Truck :Cat 769C (1996) <br />-Loader : CAT 988E std. IiR (1996) <br />Support equipment -Load area : NA <br />-Dump area :Cat D8R - BSU <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 5,000 Gal. <br />Cost Breaktlown : ruck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA dozer grader misctruk <br />Utilization-machine : 89 100 NA 100 30 30 <br />-Ripper attachment : NA NA NA 0 0 NA <br />Ownership cosVhour. $43.89 $44.45 NA $49.50 $40.78 $24.42 <br />Operating cosUhour: $4706 $63.29 NA $65.98 $13.24 $12.59 <br />Ripper op. cosUhour : NA NA NA $0.00 $0.00 $0.00 <br />Operator cosVhour : $24.03 $28.18 NA $27.99 $28.18 $23.61 <br />Unit subtotals: $114.98 $135.92 NA $143.48 $82.20 $60.62 <br />Number of units : 4 1 0 1 i 7 <br />Group subtotals : Work : $595.85 Support : $143.48 Maintenance : $142.82 <br />Total work team cosVhour : $882.15 <br />Initial Swell Loose <br />volume: 166,667 LCY factor: NA volume: 166,667 LCY <br />Source of quantity take-off :Henderson estimate 250,000 tons <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis <br />Material weight : 3,000 pounds/LCY Struck volume : 22.90 LCY <br />Descr.: USER-PROVIDED WEIGHT DATA Heaped volume : 30.90 LCY <br />Rated payload : 80,260 pounds Average volume : 26.90 LCY <br />Payload capacity : 26.75 LCY Adjusted capacity : 26.75 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 28.00 LCY <br />oatlina Tool Ca ap city <br />Rated capacity (nom. heaped) : 8.000 LCY <br />Descr.: Blasted rock -well blasted (80 - 95 % ) <br />Bucket fill (actor : 0.875 <br />Adjusted bucket capacity : 7.000 LCY <br />Truck Bed (volume) Basis <br />Job Condition Corrections : Site altitude (ft.) : 9,300 <br /> Truck Loader Source <br />Altitude adj.: 0.970 1.000 (Cat HE <br />Job efficiency : 0.830 0.830 (1 shilUda <br />Net correction :; 0.805 0.830 <br />