Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 05C <br />Date : 04/29/2002 <br />User: ESC <br />PermiUjob# : M-1977-342 <br />Abbreviation :none <br />Filename : M342-OSc <br />Agency or organization name : DMG <br />Permit or other job action :Reevaluate amount o/required bond <br />Task description : Reclaim Mi!! ACCESS Roads <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 45,173 <br />State :Colorado <br />County :Grand <br />Site :Henderson Mine <br />Basic machine : Cat DBR - 8SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization <br />Ownership cosUhour : $49.50 NA <br />OperatingcosUhour : $65.98 100 <br />Ripper op. cosUhour : $3.75 50 <br />Operator cosUhour : $2799 NA <br />Total unit cosUhour : $147,22 Total fleet cosUhour <br />Swell Loose <br />BCV factor: 1.330 volume: 60,080 <br />302.96 <br />Source of estimated volume :Assume light grading 28 acres 1'd. <br />Source of estimated swell factor :50% rock 50% earth <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 9,000 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.486 /LCY <br />fob Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 7.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (lshifUda} <br />Spoil pile : 0.80 (ind-d) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.36 <br />Adjusted unit production <br />Adjusted fleet production <br />605.93 <br />$294.45 <br />LCY <br />LCY/hr <br />LCY/hr <br />Total job time : 99.15 Hours <br />Total job cost : $29,196 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />