|
CIRCES Cost EstimatingSOkware
<br />DEMOLITION WORK
<br />PROJECT IDENIIFlCATION
<br />Task A : 058
<br />Dare: 21-Jun-2002
<br />User: ESC
<br />Permitting aGion : FeevaWale amount of batl
<br />Task description : MIII Site ShuttUrel Dea
<br />Agency or organization name :OMG
<br />Slate:Cobrado Permif/pbx: M-1977-342
<br />Counry:Grand Abbreviaticn:none
<br />Slle: Hentl¢rspn Mine Filename: M342-05a
<br />UNfT COSTS
<br />Last unit cost update: January 2001 Location etljus[menr: B9.OOro
<br />STRUCTURE Or ITEM DESCRIPTION
<br />-PC3 Ca veyor Orivehouse
<br />-PC3 Conveyor Concrete Floor DIMENSIONS
<br />463,382 tuft
<br />5651 sq. R. DEMOLITION MEiJU SELECTION
<br />Demo./lisp./apps dump-to l5 mi.
<br />Bfasf/dhp. on site OUANTITV
<br />483,382.00
<br />5,651.00 UNIT
<br />CF
<br />sf UNIT COST
<br />$05912
<br />51.3500 TOTAL COST
<br />52]3.934.]3
<br />8].628.85
<br />Concrete Footing- remain in prate
<br />
<br />-Conveyor Maint. Shop (LOCI) 1,483.488 cu.k Denroldisplappr. tlump - to 15 mi. 1,483.488.00 CF 30 5912 38]6,984.62
<br />Conveyor Mainf. Shop (LIJCIJ Concrete Floor 43632 BlasbdisP. on site d3.63200 sf 51.3500 558.903.20
<br />Concrete Footing- remain in place
<br />
<br />-TNT Mainfenanc¢ 115,900 cu.h Demo/dsp /apps tlump-m 15mi tt5900 r40 CF 505912 $6851590
<br />-TNT Maintenance Concrete Floor 6100 BlasVdisp. on si(e 6,100.00 sf 31.3500 58,23500
<br />Concrete Footing remain in place
<br />
<br />-Mill BUiltling 9,532900 cu. tt. Demo./tlisp /aPPr. dump-to l5 mi. 9,532900.00 CF $0.5912 35.635506]6
<br />-Mill Building Caerete Floor 242840 BlasUtlisp. on srfe 242640.00 st 31.3500 $32],564.00
<br />Concrete Footing- remain in place
<br />
<br />-Ore 3(orageBCOnveyor Terminus 541,600 cu.k Demo./disp./apps tlump-fo l5 mi. 541,60000 CF 505912 5320.1]4.39
<br />-Ore Storage&COn veyor Concrete Floor 30910 Blast/tlisp asite 30,91000 sl 51.3500 541,]28.50
<br />-Concrete F-ootirg 8 (12" 12" JSf slab a g zde. mote -rptl rein) 640 00 CY 5100.0000 364.00000
<br />
<br />-200 tt. Diameter Tank 345516 cu.R Demo./tlisp /appr. tlump-fp l5mr. 3455]6.00 CF 30.5686 3196,d9L95
<br />-20011. Diameter Tank Concrete Floor 31416 Blast/disp. on sRe 31,416.00 sl 51.3500 $42.df 1.60
<br />Concr¢(e Footing-remain in place
<br />
<br />-Mobile EgviDment Shop 190,912 cu. /! Demo/tlisp./appr. dump-to l5 mi. 190,91200 CF 50.5686 5108.554.06
<br />-Mobile Equipment Shop Concrete Fbor a8>9 sqR Blas!/drsp.asi/e 6,8]900 sl 51.3500 89.286.65
<br />Concrete Footing- remain in place
<br />
<br />-Nukes Storage Bld. 114,266 cu. h. DempJdisplappr. dump-fo l5 mi. 114.266.1))' CF $0.5912 $6],549.94
<br />-NOkBS Storage Bld GoncBfe Flgor 5274 sq. R. Blastldisp. on srfe 52]4.00 st 31.3500 3],119.90
<br />Concete Footing- remain in place
<br />
<br />-Haz. WasteiFlammabte Bldg 24,922 cuR Demp,MisO rappc dump-to l5 mi. 24,922.00 CF 305912 514.24299
<br />-Haz Waste/Flammable Bldg. Concrete Floor 1466 sq.ft Blasf/disp. on site 1,465.00 s/ 51.3500 31,9]9.10
<br />Concrete Footing- remain in place
<br />
<br />-Bulk Storage Whse. 95,200 cuff. Demo./disp./apPc dump-fo lSmi. 9520000 CF 305912 556,2]8.81
<br />-Bulk Storage Whse. 56005q R. BlasUdisp. on site 5600.00 s/ $L3500 3],56000
<br />Concrete Fooling- remain in place
<br />
<br />-TNCk SCale Bldg 28.158 cu.k Oemo./disp/apps dump-fo l5 mi. 28.15800 CF 50.5812 $]6.645.99
<br />-Truck 3CdlB Concrete Floor 14825q. tt. Blasddisp.asite 1,482.00 sf 31.3500 $2,000JO
<br />Cat ete Fpoling-remav~ in place
<br />
<br />-Electric Sw4cngear Bltlg. 24,480 cu.k Demoldisp /apps dump-fo l5 mi. 24,48000 CF $0.5912 314,411.69
<br />-Electric Switchgear Concrete Floor 1530 sq. R. Blasf/tlisp. on srfe 1.530.00 sf 51.3500 32,06550
<br />Concrete Pooling- remain in place
<br />
<br />-Sewage Treatment Bldg 500 cu. R. Demo/disp/appr, tlump-to l5 mi. 50000 CF 30.5686 5284.30
<br />-Sewage Treatment BWg. Concrete Flcer 500 sqH HlasVdisp.asife 50000 s/ 51.3500 36]5.00
<br />Concrete Fatin .remain in place
<br />
<br />-Process%POfable Water7anks 21d,560 cu. tt. Demo./disp/apPC dump-to lSmi. 21d,560.00 CF 305912 $126,84014
<br />-Pmcess/POtable Water Concrete Floor 6105 Sq. R. BlasUdisp.asite 6.]05.00 sl 31.3500 39,8$1)5
<br />Concrete Eating. remain in place
<br />
<br />-ASpnaR Demolrfrbn 159,9]6 SY Pavemen), bilum. -3'rh. 159.9]6.00 SY 528100 $449,532.56
<br />
<br />
<br />
<br />
<br />
<br />108 COST Totel (a4l. for location): $7,846,876 Tatal COSt (una0lusted): $8.816,115
<br />
|